HOW TO MAKE A PROTECTION PLAN OR WARRANTY CLAIM AT

How to plan PDU in a data center

How to plan PDU in a data center

You'll learn how to assess your data center's power needs, calculate the number of PDUs required, and select the right models for your infrastructure. By the end, you'll have the tools and knowledge to make informed decisions, ensuring your data center runs smoothly and. Without proper power distribution units, even the most advanced data center can face unexpected downtime, overloaded circuits, or inefficient energy use. Data center PDUs distribute power from UPS or utility-backed systems to rack equipment. This guide explains PDU types, key features, deployment styles, and how to choose the right unit for uptime, monitoring, and power efficiency.

Read More
How to make two small busbars run fastest

How to make two small busbars run fastest

To solve this, engineers bolt multiple thinner busbars together in a parallel configuration, leaving a distinct air gap between each bar (typically equal to the thickness of one bar). HIGH POWER DENSITY: With the increasing demand for higher power in electric vehicles, busbars with high power density need to handle a larger current flow in a smaller cross-sectional area, thereby also reducing the size and weight of the components. The quickest and most common method of protective device sizing is using the power dissipative RMS current to size the busbar. As part of my research, I'm doing calculations on a hypothetical high-current (4000 A) medium-voltage (5000 V) DC power transmission system using two parallel busbars. Is it correct to put two busbar of same phase without spacing? I know that when we connect two busbars it must be connected with appropriate number of bolts (depending on busbar size) so I just wondering is this correct or there should be some space between them? Pretty much he who designs it picks. Simulations and measurements are used to determine the stray inductance of the different busbars.

Read More
How to read the relay protection action time

How to read the relay protection action time

The core of the action time test lies in measuring the time interval that the relay protection device takes from receiving the fault signal to issuing the tripping command. ‌Direct voltage application method‌ : Directly apply an action voltage and action current to the protection, and ensure that the phase angle between the voltage and current is within the action range. The zone1 time delay (Z1PD & Z1GD) is generally set to zero, giving instantaneous operation. Direction: Forward Typically required zone 2 reach impedances = 100% line impedances. Functions to give a desired amount of time delay before or after any point of operation in a switching sequence or protective relay system.

Read More
How to determine if a cable tray is a fire protection cable tray

How to determine if a cable tray is a fire protection cable tray

This guide walks you through everything—testing standards, methods, equipment, and what the results mean for safety. What Is Fire Resistance Testing of Cable Trays?Fire resistance testing is the only way to be sure. This is a test for electric cable systems that are required to maintain circuit integrity, so is therefore written around and is dependent on the cables themselves, but containmen of 90 minutes (the maximum time covered by DIN 4102-12). Cable tray installation must comply with specific technical standards to ensure electrical safety, system reliability, and long-term maintainability. This document outlines the key requirements for cable tray layout, installation, and fireproofing in industrial and commercial environments. Through these tests the aim was to learn more about thermal conductivity properties in fire conditions and what effects it would have on the tray itself and how long the installed cable.

Read More

Get In Touch

Connect With Us

📱

South Africa (Sales & Engineering HQ)

+27 10 247 8396

📍

Headquarters & Manufacturing

Unit 7, Summit Place, 21 Summit Rd, Midrand, Johannesburg, 1685, South Africa