LINE VS. LOAD 7 CRUCIAL DIFFERENCES YOU NEED TO KNOW NOW

Distribution box outgoing line to load

Distribution box outgoing line to load

① 220V load generally takes one phase line, one zero line and one ground line. )‌Trace the outgoing line circuit‌: Analyze the outgoing line circuits of the distribution box one by one, understand the load equipment and protection method of each circuit, and ensure that each load can be reliably powered and protected. And all the switching and protective devices are installed in the distribution box. Whether you have a new or existing facility, the single-line diagram is the vital roadmap for all future testing, service and maintenance activities.

Read More
Standard Static Load of Network Cabinets

Standard Static Load of Network Cabinets

Most data-center racks are 19-inch EIA-310 frames in 42U–52U height, 600–800 mm width, 1000–1200 mm depth, rated 1000–1500 kg static with front-to-back airflow, bonded to a site earthing bar via a dedicated M8/M10 earth stud; performance depends on correct cable management . four-post EIA cabinet or rack, with mounting posts that conform to English universal hole spacing per section 1 of ANSI/EIA-310-D-1992. This European Telecommunication Standard (ETS) has been produced by the Equipment Engineering (EE) Technical Committee of the European Telecommunications Standards Institute (ETSI). The cabinets are used to bring together IT equipment and the corre ponding cables neatly in one place. Three key specifications — ANSI/EIA RS-310-D, IEC 60297-2, and DIN 41494 — have defined the foundation of 19-inch rack design used across. When choosing electronics racks for your data center, there are many factors to consider.

Read More
Load Balancing of Layer 3 Core Switches

Load Balancing of Layer 3 Core Switches

Dynamic Load Balancing (DLB) is an advanced and intelligent hashing mechanism that dynamically directs traffic over underutilized links. This occurs at the IP layer (Layer 3 in the OSI model) and is often implemented in modern networking hardware such as Nexus 9000 series switches. While application load balancers can be used to distribute load across across an array of devices for a particular application or purpose, this article will. Currently only the EX3300 connects to our WAN Router and is trunked via 4 LACP links to the HP2848.

Read More
Do you need qualifications to dismantle a telecommunications tower

Do you need qualifications to dismantle a telecommunications tower

Quick Answer: To become a tower technician, complete a training program at a trade school or technical institute (2-6 months for a certificate), then earn required safety certifications (OSHA 10, TTT, Competent Climber/Rescuer). PTTG has experienced crews available to help when owners determine they no longer need their tanks, towers, or other structures and require them to be dismantled and removed, including scrap disposal and site cleanup. Telecom tower safety standards are the most important guidelines in the telecommunications industry. MRS Training & Rescue is an approved PASMA Training Centre and we are audited each year to ensure we continue to provide the standard. Sometimes, due to technology upgrades, urban expansion, lease issues, or cost inefficiencies, telecom operators must decommission — or shut down — certain tower sites. ACT Technology carries out the safe dismantling of towers that have reached the end of their service life or are surplus to requirements, and relocates them to new sites when necessary.

Read More

Get In Touch

Connect With Us

📱

South Africa (Sales & Engineering HQ)

+27 10 247 8396

📍

Headquarters & Manufacturing

Unit 7, Summit Place, 21 Summit Rd, Midrand, Johannesburg, 1685, South Africa